CASE STUDY

A New Chapter for a 1970s Home

A detached 1970s bungalow in Co. Kerry, inherited as a family property and vacant for several years, extended and redesigned before being retrofitted from E1 to A3 — cutting carbon emissions by over 90%.

€24,100 SEAI Grant Secured

Full Project Management

Oil Heating Eliminated

BEFORE

E1

320.79

kWh/m²/yr

73.64

kgCO₂/m²/yr

AFTER

A3

53.71

kWh/m²/yr

6.87

kgCO₂/m²/yr

267.08 kWh/m²/yr

improvement in energy performance

A3

New BER Rating

E1

Previous BER Rating

€24,100

SEAI Grant Secured

€18,711

Client Net Cost

€44,871

Total Project Value

94m²

Floor Area

32 wks

Mar to May 2025

6.87

kgCO₂/m²/yr Improvement


THE STORY

Bringing a 1970s Bungalow Back to Life

Jennifer Casey inherited this detached bungalow in Kilcummin, Co. Kerry — a family property that had stood empty for several years.

Built in the 1970s, the house needed more than an energy upgrade: an E1 rating, a dated layout, and running costs to match. Jennifer wanted to bring it up to today’s standards and reshape it to suit modern living, while making the most of the SEAI grants available.

The redesign went beyond a standard retrofit. The front elevation was slightly extended and the roof pitch increased, creating the space and structure for a full insulation upgrade – roof insulation above the new pitch, wall insulation to the internal lining, and floor insulation paired with a new heat pump-fed underfloor heating system that replaced the old oil boiler entirely

REIL managed the project end-to-end alongside Driver Renewables, REIL’s Kerry-based retrofit contractor, covering the extension, building fabric, heating system, ventilation, and grant administration from survey to sign-off. Works ran for around 32 weeks, from March to October 2025.

The result: a jump of 267.08 kWh/m²/yr — taking the property from E1 to A3 and cutting carbon emissions by over 90%.

Why this project stands out


THE PERFORMANCE UPLIFT

Before and After Results

MeasureBeforeAfter
BER Rating E1A3
Energy Value320.79 kWh/m²/yr53.71 kWh/m²/yr
Carbon Emissions73.64 kgCO₂/m²/yr6.87 kgCO₂/m²/yr
Heating SystemFossil fuel heating systemAir source heat pump
Energy Position Inefficient E-rated propertyEnergy-positive property

267.08

kWh/m²/yr Improvement

A family property and vacant for several years retrofitted from E1 to A3 — cutting carbon emissions by over 90%.

From Oil-Fired to A3: A Home Reimagined

From the roof down, every element of the property was touched – a structural extension paired with a complete fabric and heating overhaul.


SCHEDULE OF WORKS

Roof Elevation & Insulation

With the new roof pitch in place, insulation was installed above to dramatically reduce heat loss through the roof.

Wall & Floor Insulation

Insulation was fitted to the internal wall lining throughout the property and underfloor to address heat loss at ground level.

Air Source Heat Pump & Underfloor Heating

A new air source heat pump was installed feeding an underfloor heating system throughout the home, replacing the old oil boiler.

External Doors & Windows

New high-performance windows and external doors were installed throughout the property to reduce heat loss, eliminate draughts, and close the remaining gaps in the building’s thermal envelope.

Air Tightness Works

Targeted air tightness measures closed gaps across the building fabric, working alongside the new ventilation system to lock in heat without compromising air quality

Mechanical Ventilation (MVHR)

A mechanical ventilation system was installed to maintain healthy indoor air quality in the newly airtight home, managing moisture and preventing condensation as the building fabric was upgraded.


PROJECT GALLERY

Before & After: The Kilcummin Transformation

1970s bungalow in Kilcummin, Co. Kerry — extended, insulated and upgraded

Before: The 1970s Bungalow

1970s Bungalow Retrofit Kilcummin, Co. Kerry

After: A3-Rated and Extended

1970s bungalow in Kilcummin upgraded from E1 to A3

New Heat Pump & Hot Water Cylinder

Reconfigured back of house

The Redesigned Lounge

Finished Bedroom, A3-Rated Comfort


REAL-WORLD IMPACT

The Numbers That Matter

Because the property was vacant before the retrofit, there’s no pre-retrofit bill to compare against. What the numbers below show is what it actually costs to run the newly extended, A3-rated home today – heat pump, underfloor heating, cooking and every appliance included, with the old oil boiler gone and no oil deliveries or fuel bill to budget for.

1,235

A fully renovated, A3-rated home - oil boiler gone, heat pump and underfloor heating in - for around €1,235 a year in electricity.

Electricity Bill

€243.41

9-week period (Mar – May 2026)

Electricity Bill

€179.62

9-week period (May – Jul 2026)

Oil Bill

€0

Heat pump covers all heating & hot water

Projected Annual Cost

~€1,235

Electricity only - no other fuel


CLIENT REVIEW

★★★★★

“I am very happy with how my house turned out — warm, comfortable and energy efficient. REIL’s one-stop-shop approach was easy to deal with, and Martin and his plumber Ciaran at Driver Renewables were excellent throughout. I’d highly recommend their team.”

T

Jennifer Casey

Kilcummin, Co. Kerry


CONCLUSION

What This Project Demonstrates

This project shows how much is achievable in a single deep retrofit – even starting from one of the lowest BER ratings on the scale. A vacant family home in Co. Kerry, built in the 1970s, has been extended, redesigned, and brought up to A3, cutting carbon emissions by over 90%.


Managed end-to-end by REIL and delivered by Driver Renewables, the project demonstrates what a fully coordinated retrofit – covering fabric, heating, ventilation and grant administration – can achieve for an older home, whatever its starting point.


HOW REIL MAKES IT SIMPLE

One Managed Process From Survey to Sign-Off

Jennifer had a single point of contact throughout and was not required to manage contractors, applications, or compliance separately.

1

Initial Assessment

REIL assesses the home and identifies the right whole-home upgrade pathway.

2

Retrofit Plan

A coordinated upgrade plan is created across fabric, heating, and grant requirements.

3

Grant Management

SEAI grant administration is managed as part of the overall project process.

4

Installation

The building fabric, heating system, and supporting works are coordinated together.

5

Sign-Off

 The completed project delivers an A3 BER and an energy-positive result.

Could Your Home Achieve a Similar Upgrade?

REIL manages the full home energy upgrade process, from assessment and retrofit planning to SEAI grants, installation, and final BER.